Skip to content
Back to Articles

GZCL Jacked & Tan 2.0: 6-Week Powerbuilding Block

Run our 6-week, 4-day GZCL Jacked & Tan 2.0 block: Tier 1 rep-max progression from 10RM to 1RM, AMRAP back-off sets, and high-volume Tier 2/3 work.

Strength Programs

Updated

Most intermediate lifters hit an annoying wall when chasing size and strength together: pure powerlifting blocks leave arms, delts, and quads lagging, while pure bodybuilding splits let heavy barbell numbers slip backward.

Cody Lefever designed Jacked & Tan 2.0 inside the GZCL tiered system to solve that exact split. Our GZCL Jacked & Tan 2.0 plan runs the classic 6-week, 4-day first block: every Tier 1 barbell lift steps down from a 10RM in Week 1 to a 1RM peak in Week 6, backed by percentage back-off sets, four-set Tier 2 compound builders, and high-rep Tier 3 isolation work.

The 4-Day Split and 6-Week Wave

Each week rotates through Back Squat, Barbell Bench Press, Conventional Deadlift, and Overhead Press as Tier 1 openers, paired with one Tier 2 barbell builder and three Tier 3 accessories.

Scroll to see all columns

Day Tier 1 (RM + Back-Off) Tier 2 (4 Sets) Tier 3 Hypertrophy
Day 1 Squat (RM + AMRAP) Deficit Deadlift (RPE) Leg Press 4×15, Leg Curl 4×15, Barbell Curl 4×15
Day 2 Bench Press (RM + AMRAP) Close-Grip Bench (−5%) Incline DB Press 4×12, Lateral Raise 4×15, Pushdown 4×15
Day 3 Deadlift (RM + straight) Front Squat (−5%) Lat Pulldown 4×12, Leg Ext 4×15, Hammer Curl 4×15
Day 4 OHP (RM + AMRAP) Barbell Row (Back-off %) DB Bench 4×12, Rear Delt Flye 4×15, Skull Crusher 4×12

Tier 1 intensity climbs 5% per week while rep targets drop, shifting from hypertrophy accumulation into a Week 6 peak:

Scroll to see all columns

Week Tier 1 Top Set Tier 1 Back-Off Tier 2 Reps
Week 1 1×10 @ 70% 3×6+ @ 65% 4×12
Week 2 1×8 @ 75% 3×5+ @ 70% 4×10
Week 3 1×6 @ 80% 3×4+ @ 75% 4×8
Week 4 1×4 @ 85% 4×3+ @ 80% 4×6
Week 5 1×2 @ 90% 4×2+ @ 85% 4×6
Week 6 1×1 @ 95% 3×2+ @ 85% 4×8

One smart safeguard sits on Day 3: Squat, Bench, and OHP finish with a final back-off AMRAP set, whereas Deadlift back-offs stay straight sets with no AMRAP so your lower back survives heavy Front Squats immediately afterward.

Open the GZCL Jacked & Tan 2.0 (6-Week Powerbuilding Block) spreadsheet & calculator

Download the GZCL Jacked & Tan 2.0 (6-Week Powerbuilding Block) spreadsheet

Enter your current lifts to preview every week’s weights, download Excel/CSV, or start tracking in your browser.

Enter your 1RM (or leave blank for empty template): Estimate 1RM Check Strength Standards
Percentages are calculated directly from your 1RM.

Spreadsheet Preview

DayExerciseSetsReps%Weight (lbs)Plates / sideNotes
Squat RM (10RM) + Lower HypertrophySquat11070%——Work up to today’s 10RM target
Squat RM (10RM) + Lower HypertrophySquat36+65%——Back-off sets (AMRAP on final set)
Squat RM (10RM) + Lower HypertrophyDeficit Deadlift412————
Squat RM (10RM) + Lower HypertrophyLeg Press415————
Squat RM (10RM) + Lower HypertrophyLeg Curl415————
Squat RM (10RM) + Lower HypertrophyBarbell Curl415————
Bench Press RM (10RM) + Chest/Shoulder/Tricep VolumeBench Press11070%——Work up to today’s 10RM target
Bench Press RM (10RM) + Chest/Shoulder/Tricep VolumeBench Press36+65%———
Bench Press RM (10RM) + Chest/Shoulder/Tricep VolumeClose-Grip Bench Press41260%———
Bench Press RM (10RM) + Chest/Shoulder/Tricep VolumeIncline Dumbbell Press412————
Bench Press RM (10RM) + Chest/Shoulder/Tricep VolumeLateral Raise415————
Bench Press RM (10RM) + Chest/Shoulder/Tricep VolumeCable Pushdown415————
Deadlift / Front Squat RM (10RM) + Back/LegsDeadlift11070%———
Deadlift / Front Squat RM (10RM) + Back/LegsDeadlift3665%———
Deadlift / Front Squat RM (10RM) + Back/LegsFront Squat41260%———
Deadlift / Front Squat RM (10RM) + Back/LegsLat Pulldown412————
Deadlift / Front Squat RM (10RM) + Back/LegsLeg Extension415————
Deadlift / Front Squat RM (10RM) + Back/LegsHammer Curl415————
Overhead Press RM (10RM) + Upper HypertrophyOverhead Press11070%———
Overhead Press RM (10RM) + Upper HypertrophyOverhead Press36+65%———
Overhead Press RM (10RM) + Upper HypertrophyBarbell Row41265%———
Overhead Press RM (10RM) + Upper HypertrophyDumbbell Bench Press412————
Overhead Press RM (10RM) + Upper HypertrophyRear Delt Flye415————
Overhead Press RM (10RM) + Upper HypertrophySkull Crusher412————
Prefer to track without spreadsheets?

Use Strength Programs free in your browser with automated rest timers, plate math, and workout logging.

Setting Your Maxes Without Burning Out

Unlike 5/3/1 Basic, this template does not auto-reduce your entries to a 90% Training Max—all Tier 1 and Tier 2 loads calculate directly from the seven maxes you supply (Squat, Bench Press, Deadlift, Overhead Press, Barbell Row, Front Squat, and Close-Grip Bench Press).

Be brutally honest on Day 1. Ten reps at 70% followed immediately by 3×6+ at 65% and four sets of twelve on Tier 2 will crush an inflated gym max. Plug recent crisp 3-to-5-rep sets into our one-rep max calculator, or enter a conservative 95% reference max instead of a sloppy lifetime PR. Run Deficit Deadlift and all Tier 3 isolation moves in RPE mode: pick weights that bring Sets 3 and 4 near technical failure while resting 60 to 75 seconds.

Fatigue Balance and Who Should Run It

Expect 20 to 21 hard sets per session and heavy soreness across Weeks 1–3. Progression stays fixed across the six weeks, so let the weekly 5% climb handle overload and cap AMRAP sets with one clean rep left in the tank. Eat at maintenance or a slight surplus; this volume punishes steep calorie deficits.

Run it if you are an intermediate lifter with four 75-minute gym slots per week and solid bracing on high-rep squats. Skip it if you are still a novice—start with Powerbuilding 3-Day Full Body or GZCLP Linear—or if recovery and sleep are stretched thin.

Ready to build real mass while chasing a Week 6 peak? Open the GZCL Jacked & Tan 2.0 schedule to preview every session and enter your maxes.

Frequently Asked Questions

Why is this block 6 weeks instead of 12 weeks?

Jacked & Tan 2.0 splits into two 6-week mesocycles, and most lifters repeat this first block back-to-back because it delivers the strongest mix of hypertrophy and strength. After Week 6, take a light deload, update your maxes from Week 6's singles, and either repeat or move into GZCL The Rippler.

Should I enter a 90% Training Max or my true 1RM?

This template calculates directly off the numbers you enter without an automatic discount. Enter a true, crisp 1RM—or about 95% of an ugly grinder PR—so Week 1's 10RM at 70% and Week 6's 1RM at 95% stay tough but clean.

Why doesn't Deadlift include an AMRAP back-off set?

Pulling deadlifts to failure after a top RM set spikes lower-back fatigue and wrecks posture for the four sets of Front Squats waiting next. Straight back-off sets protect bar speed and weekly recovery.

What is the best weekly schedule for these four days?

Monday (Squat), Tuesday (Bench), Thursday (Deadlift/Front Squat), and Friday (OHP) puts at least 48 hours between Day 1's Squat plus Deficit Deadlift and Day 3's Deadlift plus Front Squat.